d5bc60b9




2.1.4. Check of phases of gas distribution (Z10XE, Z10XEP, without conditioner)

Open a cowl
Disconnect plugs of the rechargeable battery

NOTE
On cars since a year of release 04 with ESP – after each detachment of the accumulator the sensor of an angle of rotation of a steering wheel loses the main installation. It needs to be calibrated anew.

Disconnect a weight wire.
Disconnect 4 sockets of a plait of wires of a control system of the engine: oil 2 pressure relay, sensor of temperature of cooling liquid 3, sensor of the camshaft 4, module of ignition 1.
Free the canal for a plait of wires 5.
Put a plait of wires aside.
Dismantle the ignition module.
Uncover the ignition module, shift it to the right.
Turn off 2 bolts of fastening.
Take out a cover by means of KM-6009 adaptation.

NOTE
Do not warp the provision of a cover.

Uncover a head of cylinders.
Dismantle 2 hoses of ventilation of a case of the engine.
Turn off 13 bolts of fastening of fastening.
Lift the car.
On the ECO model uncover the engine below.
Remove a carving stopper of a support of a bent shaft 1.
Lower the car.
Establish the provision of VMT of ignition of the cylinder 1.
Insert the KM-952 2 device.
Evenly turn a bent shaft until KM-952 adaptation is captured.

NOTE
The mark in a belt pulley of a bent shaft 4 has to be on one line with a lug 3 on the GRM case.

Insert the KM-9531 device, it has to enter a groove of camshafts.

NOTE
If it is impossible to insert the KM-953 device, then it is necessary to execute the main adjustment of phases of gas distribution.

Install KM-9541 adaptation. Get on a disk of the phase sensor 2.

NOTE
KM-954 has to enter a groove of a disk of the phase sensor.

Take out the fixing tools.

NOTE
The fixing tools cannot be used for keeping.

Lift the car.
Establish a carving stopper of a support of a bent shaft.
Replace a sealing ring.
Tighten a bolt the moment of 50 N · m.
Lower the car.
On the ECO model establish an engine cover below.
Clean sealing surfaces of a head of cylinders and a cover of a head of cylinders.
Establish a cover of a head of cylinders 1.
Replace consolidation 2 and a sealing ring.
Apply sealant (distance of 1-2 mm).

NOTE
Installation works need to be finished within 10 min.

Tighten 13 bolts of fastening the moment of 8 N · m.
Establish 2 hoses of ventilation of a case of the engine.
Install the ignition module.
Turn off 2 KM-6009 devices.
Tighten 2 bolts of fastening with the moment of 8 N · m.
Establish a plait of wires of a control system of the engine.
Lay a plait of wires.
Fix the channel for a plait of wires.
Connect 4 sockets of a plait of wires.
Connect plugs of the rechargeable battery.
Program volatile memory.
Close a cowl.